Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3193

Re: Service procurement is required to be done with some material issue

$
0
0

Hi,

   If its through PM, all will be integrated.

   If you dont want this option and follow through the condition type method, then all will be separate process, as of my knowledge. You can insert the material price as a discount condition in PO and post SES with lower value. Create a manual reservation and issue the material against the reservation! You may add the corresponding PO number in any text field in reservation for future reference.

 

Regards,

AKPT


Viewing all articles
Browse latest Browse all 3193

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>